Project Overview

To Be Provided

Product Water Quality Standard

After treatment, the wastewater shall comply with the applicable discharge requirements of GB 8978-88, Integrated Wastewater Discharge Standard at the final discharge outlet.

Parameter (mg/L)CODBODTotal NSS
Raw Feedwater30,00010,0001,5001,000
DTRO System Permeate<60<60<25<5
Removal Rate>99%>99%>98%>99%

Project Capacity

300 m³/h

Treatment Process

Cyanide Destruction System + Copper Sulfate Concentration System